Use 1 inch nails for new roofing.
How to nail roofing felt.
Cut drip edge flashing at an angle at the corner press it lightly against the eave end.
Includes useful advice on the best materials to use together with information.
As you work the paper can be tacked down in the center so it won t blow away.
Put fasteners at least every 8 inches.
Gently scrub the roof using a bristle.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
Grab loose pieces of felt and pull them off the roof.
The roofing felt should be applied in layers that overlap.
Use a construction stapler or a hammer.
Using your staple gun secure the felt to the roof.
Overlap each row at least 3 to 4 inches.
Step by step guide on how to apply bituminous roofing felt to your shed roof.
Start at the bottom of the roofline and work up so any water that gets through the roofing material will shed down the tar paper and will not go under it.
An underlayment of felt roofing is optional.
Clean the roof decking of any debris protruding nails or other objects.
Apply drip edge to the eave.
How to do it.
Roll out about 10 feet of felt and fasten with staples or roofing nails with plastic washer heads.
In roofing one square equals 100 square feet.
Apply and attach drip edge.
Install drip edge flashings roofing felt and wsu if needed.
Nail the drip edge in place.
They are long enough to penetrate the sheathing.
How to do it.
Install new flashing metal flashing is often called drip edge along the bottom of the roof near your gutters.
Remove old felt from the roof with your hands and a putty knife.
Cleaning and preparing your roof 1.
If you live in an area with inclement weather you should consider using a special ice and water protector.