Use a sturdy extension ladder that extends at least 3 feet above the eaves to climb onto the roof and secure the bottom to the foundation and the top to the eaves or fascia so it doesn t move.
How to shingle a slanted roof.
Nail drip edge accordingly.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Step 4 cutting around any obstacles.
How to finish the top shingle row on a shed roof.
The next one goes on the low side.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing.
You want to lay the shingles from the bottom to the top of the valley.
To do this begin on one end of the ridge and place the ridge cap so.
Repeat this basic pattern alternating shingles across the roof working toward the right side using the chalk line to keep the shingles straight horizontally.
Starting at the bottom of the roof map out a guideline with chalk.
Start by overlapping a starter from both sides of the valley at the bottom.
Butt a full shingle up against the cut shingle and nail into place.
Step 1 preparing the roof.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Determine when to stop laying three tab shingles and switch to ridge caps.
Sometimes you can replace new.
Then your first shingle goes on the side you are going to cut.
Your goal is to get your last row of shingles as close to the top edge as possible while keeping the.
Step 2 placing the starter roll.
See step 1 above.
Many pros shingle in a vertical line up the roof because it s much faster.
If you are renovating an old roof be sure to remove all of the old shingles first.
Weave and cut the valley on the highest side of the roof.
You will know it is time to switch to ridge caps when the non.
How to shingle a slanted shed roof.
Step 3 placing the shingles.
Install drip edge so that the top lip goes over the last course of shingles.