Take care the first piece is aligned precisely perpendicular square to the edge.
How to square a metal roof.
Lay out the rafter.
When you re starting the roof you want to square off the edge and adjust your panel if necessary.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Place the first screw.
Make your gable trim pieces large enough that they more than cover the pie shaped area which exists on either end due to out of squareness.
Complete step by step corrugated metal roofing installation.
Place the square on.
The 3 4 5 method is a shortcut t.
Typically opposite corners of a shelter are out of square or not.
Use a 3 4 5 triangle to create a vertical line for your first metal panel which is square to the eave on the end of the roof where you re starting.
Use your neoprene washer head screws to secure the metal to the sheathing.
Make sure the walls are square.
For example if this particular roof was off a little bit even by just half an inch i would tilt our panel a little bit so that we ran square starting with the first panel.
Do this by measuring three feet out from the corner along one wall and.
Determine the direction the shelter will be squared using a 4 foot level against each outer side of each post or corner assembly.
How to square a metal roof preparation.
Next find the square footage of the metal roofing panels you want to use.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Learn how to square a roof with the easy 3 4 5 triangle method.
Measure the roof area you will need to order enough metal material to cover the entire roof and this process starts with measuring the full size of your roof in square feet.
Measuring for pattern rafters.
To make the plumb.
Choose a straight rafter board with no bending.
Install the roofing screws vertically along each rib in the panel.
Space the screws about 12 in 30 cm apart down the entire piece of metal.
Do the same on the other end.
Use our roof pitch calculator to find the pitch of your roof.